3rd floor @ ArcBest -Ft. Smith, AR

In May 2021, I returned to ArcBest to paint the 3rd floor elevator lobby in a similar style to the 4th floor. A PYNAR mural was added to a 4th floor hallway.

 
20210523_181843.jpg
20210525_201902.jpg

The Before

 

The After

20210604_032831.jpg
 
 
20210605_001942.jpg
 
 
20210605_000042.jpg
 
taken from inside the storage closet                                                                                                                                                                                         this is an opened door you see on the right, notice the handle

taken from inside the storage closet this is an opened door you see on the right, notice the handle

 
 
 
 
20210605_013319.jpg
 
 
20210604_235944.jpg
 
20210605_001855.jpg
 
 
20210605_013309.jpg
 
 
20210605_001558.jpg
 
20210605_001907.jpg